Open walls
New runs, boxes, and panel capacity while you can still see the framing. That is the clean time to do it.
Services / Remodels
Quoted after a look
Gut rehabs and remodels — single-family houses and multi-unit buildings. Rough-in while the walls are open. Finish when the drywall is up. I walk the job first. The team and I run the work.
New runs, boxes, and panel capacity while you can still see the framing. That is the clean time to do it.
Outlets, plates, fixtures, and the last circuits after paint. We come back for this after the walls are closed.
A single-family remodel and a two-flat or small multi-unit gut are both work we take. The building changes the layout, not who you call.
For a rehab or multi-unit quote I need the full approved drawings from the GC and the scope of the project — what is staying, what is moving, how many units, and how far along the job is. Photos of the open walls or the panel door open help. I walk it after that.
Rehab work is quoted after I have the drawings and see the walls. Studs-to-finish jobs are too different for one number.
Send the town, the full approved drawings from the GC, the scope (single-family or how many units, what is changing), photos of the open walls or the panel door open, and a time that works.